Environmental Drilling & Remediation.

From direct push drilling to full-scale environmental construction, JREM delivers safe, reliable, and cost-effective solutions across the Western U.S.

ABOUT US

Restoring Land. Providing Trust.

JREM operates in an industry shaped by environmental challenges that require understanding and expertise to overcome. Every project completed is driven by a commitment to effectively and safely remediate the land and water we encounter. Our team brings unmatched professionalism, attention to detail, and pride in execution to every project site.

From direct push drilling to in situ remediation and environmental construction, we deliver reliable results with top tier equipment and a team that values integrity, communication, and client success.

Our Mission

At JREM, our mission is to perform accurate, efficient, and safe environmental fieldwork supported by clear communication and reliable execution. We focus on getting the job done right, with professionalism and precision at every step.

Professionals in our field of work

Our experienced team takes ownership at every stage, delivering consistent results with top-tier equipment, proactive problem-solving, and a deep commitment to client success.

SERVICES

Communication. Trust. Respect. Your Site Becomes Ours.

JHA BH LOGO

Full-service remediation and site construction. We offer systems installations, excavation, dewatering and concrete resurfacing.

JHA Icons

From well development and rehab, to pump testing and well jetting — our Semco 8000 rig handles it all.

JHA Icons -05

Real-time subsurface data and interactive 3D models that support smarter, faster remediation planning.

JHA Icons -02
On-site treatment of contaminants using ISCO, ISCR, and bioremediation, all designed and delivered by experienced teams.
JHA Icons -01
Qualified, certified field crews supporting everything from stormwater monitoring to surface coring, vapor pin installations, and soil gas surveys.
JHA Icons -04

High-quality soil, groundwater, and vapor sampling using efficient, low-impact drilling systems.

Recent Projects

JREM

Pre-pack Well Installation, Santa Ana, CA

Activated Persulfate Injection Long Beach, CA

Activated Persulfate Injection Long Beach, CA

Fault2

Fault Line Excavation, Hayward, CA

DPT_Field Services_Soil Vapor

Chemical Manufacturing Facility, City of Commerce, CA

DPT_540B

Groundwater Sampling, Garden Grove, CA

Injections

Vandenberg Air Force Base, Lompoc, CA

DPT

Chemical Plant, Fullerton, CA

20220809_094531

Wellhead Maintenance, Bell Gardens, CA

Ready to Get Started?

Tell us about your project and we will get back to you within 24 hours.

 

Proudly serving the entire state of California. 

So Cal Office

15375 Barranca Parkway, Suite J-101
Irvine, CA 92618

Nor Cal Office

392 West Larch Road, Ste. 5
Tracy, CA 95304