Proven Project Experience Across California

From large-scale injection systems and soil vapor wells to rapid one-day site investigations, JHA Remediation delivers field-proven environmental services backed by over 50 years of combined experience.

JHA REMEDIATION PROJECTS

JHA Remediation delivers expert environmental support across projects of all sizes—from complex injection systems, multi-depth sampling, and soil vapor well installations to single-day soil investigations. Below are select projects that showcase our technical capabilities and depth of experience.

Oakdale UST Removal

7/11 Store/Gas Station

Oakdale, CA

  • UST Demoltion/Removal
  • Dispenser Island Removal
  • Backfill & Concrete Resurfacing

Hunters Point Naval Shipyard, San Francisco, CA

Direct Push Soil Sampling

Period of Performance: 2024 (July – Oct.)

  • 1,419 borings to 10 feet bgs with multiple crews.
  • MC7 Sampling to collect 3,900g/sample.

Travis Air Force Base, Fairfield, CA

Direct Push Sampling & Groundwater Well Installation

Period of Performance: 2023 & 2025

  • Soil & Hydropunch Sampling at 25 locations
  • Groundwater Well Installation at 22 locations.
  • Well Development at 30 total wells

Well Development – Keifer Landfill, Sacramento County, CA

Well Development Services – Chemical Rehab & Pump Modifications

Period of Performance: 2024

JREM’s Well Development team completed chemical rehabilitation and pump modifications across multiple extraction wells at Keifer Landfill. Pump depths ranged from 140–180 feet, with varied discharge pipe sizes, including 6-inch galvanized steel on 21-foot sections.

To remove pumps, JHA designed custom elevators and used the Semco 8000 (16,000 lbs. pulling capacity). After removal, the team chemically treated, swabbed, brushed, and bailed the wells to improve flow rates. Pumps were reinstalled using 3-inch trilock PVC, replacing corroded steel, and system plumbing and well heads were updated as needed.

Chemical Manufacturing Facility, City of Commerce, CA

Direct Push Soil Vapor Well Installation & Surface Coring Services

Period of Performance: 2017

  • 38 surface cores and hand augers.
  • 34 ¾-inch PVC soil vapor probes installed.
  • Well box installation.

Heavy Equipment Yard, Corona, CA

Direct Push Soil Sampling & Surface Coring Services

Period of Performance: 2024

  • 43 surface cores.
  • 43 continuous core soil samples to 35 feet.
  • Bentonite/Grout backfill & resurfacing.

Vandenberg Air Force Base, Lompoc, CA

Direct Push Injection Services

Period of Performance: 2022

  • 228 locations to 30 feet bgs.
  • Use of hollow stem attachment to penetrate caliche lens to obtain injection objectives.
  • Pressure grout backfill.

Chemical Plant, Fullerton, CA

Direct Push Soil Sampling with Sextuple Soil Vapor Well Installation & Well Box Installation

Period of Performance: 2023

  • Surface coring.
  • 12 sextuple wells to 60 feet bgs
  • Dual well box installation

Apartment Complex, Los Angeles, CA

Vapor Pin Installation Services

Period of Performance: 2024

  • 24 locations.
  • Flush mounted installations.

Wellhead Maintenance, Bell Gardens, CA

Removed and reinstalled wellhead components for inspection and servicing at 22 on and off-site wells.

Injection Services – Alameda Point OU-2B, Alameda, CA

Injection – Enhanced In-Situ Bioremediation Services Period of Performance: 2018

JREM was contracted by CB&I Federal Services to perform In-Situ Bioremediation at the Alameda Point OU-2B site in California to treat groundwater contaminated with chlorinated solvents.

Key activities included:

  • Preparation of anoxic water using sodium sulfite and sodium ascorbate

  • Controlled injection at ≤10 psi to prevent daylighting and formation damage

  • Use of customized trailers for simultaneous injection into 10–15 wells

  • Spill containment, substrate handling, and site mobilization/demobilization

A total of 268,000 gallons of solution was injected. JREM’s expertise in managing shallow groundwater and optimizing injection sequencing was praised by the client.

Recycling Plant, Anaheim, CA

Direct Push Soil Sampling, Soil Vapor Well, Concrete Coring and Well Box Installation

Period of Performance: 2022

  • Limited Access Skid/Dolly
  • 16 dual nested locations to 25 feet bgs
  • Bentonite/Grout slurry seal
     

Aerospace Facility/French Drain Installation

Queen City Farms, Washington

  •  Large Diameter French Drain installation

  •  2 precast manhole installation / connection to existing SD

  • Deep Slide rail shoring (33’ below grade)

  • Grading / Hydroseeding

Ready to Partner with JREM?

Whether your project requires limited access drilling, vapor pin installations, or complex injection systems, JHA Remediation provides reliable, experienced crews and precision results every time.